REMEDIATUM // Thesis 2017 // Studio Karen Lange
REMEDIATION HUB/SCULPTURE PARK . Hunter’s Point Naval Shipyard, San Francisco, California
TOXIC FOUNDATION . PROGRAM UNHINGED. MECHANICS REGENERATED
+2017 The Remediators begin to excavate the soil and breakdown existing structures, carrying pieces high up into the sky, far above the datum line and the ground below.
+2159 The soil still shows high toxicity levels, however, as they have lowered, so has the datum line. Unlike before, the ground is starting to be seen from the solar grid.
+2317 The site’s remediation process is complete. Nature has recovered and the building scraps have become sculptures across the landscape. People come throughout the year to experience the open-air museum and re-connect with the site in a positive way.
VIEWS FROM THE REMEDIATORS ACROSS THE SITE + OVER TIME
SITE SECTION MODELS
1.5'x 6" x 4' . Plaster, rebar, steel, acrylic, metal mesh.
REMEDIATOR MODELS
2'x 2'x 3' . ABS, acrylic, mat board, electronic parts.
PROCESS AND SITE ANALYSIS MODELS